Guide · For resellers and manufacturers
What is the ATC in a GeM bid, and how do I object to an unfair clause?
By Saurav Gupta, Founder, Namami B2G · Reviewed by Saurav Gupta · Updated
Short answer
The ATC (Additional Terms and Conditions) is the part of a GeM bid the buyer writes for that one purchase, on top of GeM's General Terms and Conditions (GTC). It is where most bid-specific demands live: OEM authorisation, certificates, experience, turnover proof and quantity-option clauses. Read it before you price, check whether a clause breaks GeM's own limits, and if it does, raise a representation within 4 days of the bid being published. After that window, the terms apply to every bidder.
Key facts
- Every bid is governed by both the GTC and the buyer's ATC. GeM bid documents carry the buyer's "Buyer Added Bid Specific Additional Terms and Conditions" and state that the bid "is also governed by the General Terms and Conditions" (2026 GeM bid corrigendum).
- Objections have a 4-day window. Sellers can raise objections to the ATC "within 4 days of bid publication on GeM" through the representation window in the seller dashboard, and the buyer is not allowed to open bids if it fails to reply (sample GeM bid).
- GeM lists what an ATC must not contain. The disclaimer printed on GeM bids says that if the buyer adds, for example, a named brand or dealer, a demand for EMD contrary to the GTC exemptions, or experience only from one specific organisation, the bid and resulting contracts are treated as null and void and GeM may cancel the bid (2026 GeM bid corrigendum).
- A corrigendum can replace the ATC. A 2026 corrigendum states its terms "supersede all existing" buyer-added terms from the bid and earlier corrigenda (2026 GeM bid corrigendum). Always read the latest version.
- The buyer, not GeM, applies the ATC at evaluation (GeM notice).
What is the ATC in a GeM bid?
GeM's GTC is the standard rulebook that applies to every bid on the portal. The ATC is the buyer's own addition for one purchase. On the bid document it appears as buyer-added terms, often with an uploaded ATC file you have to open separately.
Because the ATC is written per bid, two bids for the same product can ask for very different things. That is why a seller who reads only the item and quantity, and skips the ATC, is the seller who gets disqualified at technical evaluation. See why GeM bids get rejected in technical evaluation.
What do ATC clauses typically ask for?
These clauses appear in real GeM bids. Read your bid's ATC for each of them.
| Clause type | Example from a real GeM bid | What to prepare |
|---|---|---|
| OEM authorisation | The bidder submits the manufacturer's authorisation of the proposed brand (2025 bid) | A letter from the OEM quoting this bid, if the wording is bid-specific (guide) |
| Product certificates | STQC certificate of the proposed brand (2025 bid) | The certificate for the exact model offered |
| Experience | Minimum years of experience and a number of similar work orders (2025 bid); an experience certificate with the supply order (2026 bid) | Completion certificates and the matching purchase orders |
| Turnover proof | Average turnover over three years, proved by a CA certificate with UDIN (2025 bid) | A fresh CA certificate in the form asked |
| EMD exemption proof | MSME or NSIC registration certificate for EMD exemption (2026 bid) | Udyam or NSIC certificate, and confirm you qualify (traders do not, for goods) |
| Quantity option | The buyer can increase or decrease quantity or duration up to 25% (2026 bid) | Price and stock plans that survive a 25% swing |
Which ATC clauses are not allowed?
The disclaimer GeM prints on bids lists ATC content that makes the bid and resulting contracts null and void, with GeM free to cancel the bid at any stage (2026 GeM bid corrigendum). In summary, a buyer's ATC must not:
- Define Class I or Class II local suppliers differently from the DPIIT order.
- Demand EMD from sellers who are exempt under the GeM GTC.
- Name a specific brand, make, model, manufacturer or dealer.
- Make physical submission of documents a condition to qualify.
- Require samples with the bid, or sample approval during evaluation (trials are allowed in listed categories under the buyer's approved policy).
- Mandate foreign or international certifications without naming equivalent Indian standards.
- Require experience only from a specific organisation, department or institute, or require foreign or export experience.
- Conflict with the MSME procurement policy or the Make in India preference policy.
- Refer to conditions on external websites or in external documents.
The same disclaimer also bars some bid structures, such as a BoQ bid for a single item or a custom bid for items that have regular GeM categories.
How do I object to an unfair ATC clause?
- Read the ATC on the day you see the bid. The objection window is counted from publication, not from the closing date.
- Match the clause to GeM's own list. If the clause names a brand, demands EMD from an exempt seller, or limits experience to one organisation, quote the disclaimer item it breaks.
- Raise a representation within 4 days of bid publication through the representation window in your seller dashboard (sample GeM bid). Keep it short: the clause, the rule it conflicts with, and the change you ask for.
- Watch for a corrigendum. If the buyer accepts, the change usually arrives as a corrigendum that supersedes the earlier terms. Re-read the whole ATC in the new version before you bid.
- If the window has passed, the clause stands for every bidder. Decide whether you can meet it, rather than bidding and hoping the buyer will not apply it.
ATC reading checklist
| Question | If the answer is yes |
|---|---|
| Is there an uploaded ATC file, not just the buyer-added text on the bid page? | Open and read the file; it often holds the strictest terms |
| Is there a later corrigendum? | Read the latest one; it may supersede the earlier ATC |
| Does it ask for an OEM authorisation "for this bid" or quoting the bid number? | Request a bid-specific letter from the OEM the same day |
| Does it ask for a certificate for the proposed brand or model? | Check you hold it for the exact model you will offer |
| Does it set experience, turnover or service conditions? | Collect the proof in the exact form asked, or skip the bid |
| Does any clause look like an item on GeM's prohibited list? | Raise a representation within 4 days of publication |
| Does it allow the buyer to change quantity by up to 25%? | Price for the swing |
Sources
- 2026 GeM bid corrigendum: buyer-added ATC, GTC applies, disclaimer of prohibited ATC content, superseding corrigendum, 25% option clause
- Sample GeM bid (2022): ATC objections within 4 days of bid publication; buyer must reply before opening bids
- Sample GeM bid (2025): OEM authorisation, STQC certificate, experience and CA turnover clauses in an ATC
- GeM notice: buyers evaluate bids under the GTC and the ATC; no role of GeM in evaluation
FAQ
What does ATC mean in a GeM bid?
ATC means Additional Terms and Conditions: the terms a buyer adds for one specific bid, on top of GeM's General Terms and Conditions (GTC). They often hold the bid's OEM authorisation, certificate, experience and turnover requirements.
How many days do I have to object to an ATC clause on GeM?
GeM bid documents allow sellers to raise objections within 4 days of bid publication, through the representation window in the seller dashboard. The buyer is not allowed to open bids if it fails to reply.
Can a GeM buyer ask for a specific brand in the ATC?
No. The disclaimer on GeM bids lists naming a specific brand, make, model, manufacturer or dealer among the ATC contents that make the bid and resulting contracts null and void, with GeM able to cancel the bid.
Can a GeM buyer ask exempt MSEs to pay EMD through the ATC?
No. Demanding EMD in contravention of the exemptions in the GeM GTC is on GeM's list of prohibited ATC content. Note that for goods, the MSE exemption covers manufacturers, not traders.
What if a corrigendum changes the ATC after I have read it?
Read the latest corrigendum in full. GeM corrigenda can state that their terms supersede all earlier buyer-added terms, so the version you priced against may no longer apply.