Short answer
On GeM, the buyer, not GeM, decides whether your bid is technically acceptable, and it judges you only on what you uploaded against the bid document and its Additional Terms and Conditions (ATC). Most technical rejections come from a missing or wrong document: an OEM authorisation, experience or turnover proof, an EMD exemption claim, or a Make in India declaration. If you are disqualified, you can file a representation within 48 hours of the bid result being published, but it cannot add a document you did not upload.
Key facts
- GeM does not evaluate bids. GeM states there is "no role of GeM in Bid evaluation process"; buyers judge technical and commercial acceptability under the GeM GTC and the bid's ATC, and bidder objections go to the buyer (GeM notice).
- Non-responsive bids are rejected. A 2025 GeM bid states that bids "not responsive to the requirements of the Tender Document will be rejected" (sample 2025 GeM bid).
- You have 48 hours to challenge. GeM's bid manual gives bidders a representation option against the buyer's technical decision, with 48 hours from bid result publication to raise it; the buyer must address representations against disqualification (GeM user manual).
- Objections to the ATC itself have a different window: within 4 days of bid publication, through the representation window in the seller dashboard, and the buyer cannot open bids without replying (sample GeM bid).
- EMD exemption is narrower than many sellers think. Under the MSE category, only manufacturers (for goods) and service providers (for services) are exempt; traders are excluded, and the supporting document must be uploaded with the bid (sample GeM bid).
Who decides if my GeM bid is technically qualified?
The buyer does. GeM provides the e-bidding tool, but its own notice says it has no role in evaluation and is "neither audit nor vigilance" for buyers. The buyer checks each bid against the eligibility criteria and compliance requirements written in its bid document, the GeM General Terms and Conditions (GTC) and the bid-specific ATC (GeM notice).
Two things follow from that:
- The bid document is the whole test. The buyer does not look at your reputation, your GeM rating or documents you sent by email. It looks at what you uploaded against what the bid asked for.
- Complaints go to the buyer, not to GeM. If you think the evaluation was wrong, the route is the representation option on the bid, not a GeM support ticket.
What are the most common reasons for technical rejection?
Most rejections are document problems, not product problems. Check each of these against the bid before you submit.
1. A required certificate is missing. Bids list the documents they require. A 2025 bid, for example, lists "OEM Authorization Certificate" and its ATC asks for an STQC certificate of the proposed brand (sample 2025 GeM bid). If the bid lists it and you did not upload it, you are non-responsive.
2. A generic letter where a bid-specific one was asked. When the bid or ATC asks for an OEM authorisation for this bid, a one-year dealer certificate does not answer it. See our OEM authorisation guide for what the letter must say.
3. Experience or turnover not proven in the form asked. Buyers set experience (0 to 3 years) and turnover criteria when they create the bid (CRPF bid checklist), and the ATC often fixes the proof: a 2025 bid asks for a turnover certificate signed by a Chartered Accountant with a UDIN (sample 2025 GeM bid). Past-performance clauses ask for copies of the contracts that prove the quantity supplied (sample GeM bid).
4. An exemption claimed without proof. If you seek exemption from experience or turnover criteria, or from EMD, the supporting document must be uploaded "for evaluation by the buyer" (sample GeM bid). A trader claiming the MSE EMD exemption will fail, because traders are excluded from it.
5. A Make in India claim that does not hold. Where a bid applies purchase preference for local suppliers, the supplier self-certifies that the item meets the minimum local content, and states where the local value addition happens. Above ₹10 crore, a certificate from the statutory or cost auditor (for companies) or a practising cost accountant or chartered accountant is required. A false declaration can lead to debarment for up to two years under GFR Rule 151(iii) (Make in India order text).
6. The offered product does not match the specification. In a 2025 bid the ATC states plainly that a bidder who does not comply with the technical requirement "shall be disqualified" (sample 2025 GeM bid). Compare your model's datasheet with every parameter in the bid, not just the headline ones.
7. A clarification answered late. Buyers can seek clarifications on documents during technical evaluation, and the time allowed is set per bid: one 2022 bid allows 5 days, a 2025 bid allows 2 (sample GeM bid, sample 2025 GeM bid). Watch your GeM dashboard and email every day while a bid is under evaluation.
How do I challenge a technical rejection on GeM?
- Read the rejection reason. The buyer's reason is shown against your bid's technical status.
- File the representation within 48 hours of the bid result being published. Use the representation option on the bid listing page, write a short description of why the decision is wrong and upload supporting documents (GeM user manual).
- Point to the bid's own words. The strongest representation quotes the clause the buyer applied and shows where your uploaded document already meets it. Practitioner guidance treats this as a one-time chance, so make it complete the first time (Edafter: challenges representation).
- Track the reply. The buyer must address every representation against a disqualification, and you can see the history from the bid listing (GeM user manual).
What a representation cannot do is fix the bid. If the bid required a document and you did not upload it, explaining why it was missing will not usually change the result. The work has to happen before submission.
Pre-submission checklist
| Check | Where to look | Why it matters |
|---|---|---|
| Every document in the bid's required list is uploaded | Bid document "Document required from seller" and the ATC | A missing document makes the bid non-responsive |
| OEM authorisation quotes this bid number, if the bid asks for bid-specific authorisation | ATC wording | A generic dealer certificate fails a bid-specific requirement |
| Experience and turnover proof is in the exact form asked (contracts, CA certificate with UDIN) | ATC and eligibility section | The buyer checks form as well as substance |
| Exemption claims (EMD, experience, turnover) carry their supporting document | Bid document exemption clauses | An unproven exemption is treated as not claimed |
| You are eligible for the exemption you claim (manufacturer, not trader, for MSE EMD) | Bid document EMD clause | Traders are excluded from the MSE EMD exemption |
| Make in India self-certification matches your real local content | MII section of the bid | A false declaration can lead to debarment |
| Your model meets every technical parameter | Bid specification vs datasheet | Non-compliance with technical requirements disqualifies |
| Someone checks the dashboard daily during evaluation | GeM seller dashboard and email | Clarification windows can be as short as 2 days |
| Objections to unfair ATC terms raised within 4 days of publication | Seller dashboard representation window | After that window, the terms stand for every bidder |
Sources
- GeM notice: no role of GeM in bid evaluation; buyers decide under GTC and ATC
- GeM user manual (single packet bid): representation within 48 hours of bid result publication
- Sample GeM bid (2022): ATC representation within 4 days, EMD exemption rules, exemption proof, past performance
- Sample GeM bid (2025): OEM Authorization Certificate, CA turnover certificate with UDIN, non-responsive bids rejected
- CRPF checklist for preparing a bid on GeM: experience, turnover and other eligibility settings
- Public Procurement (Preference to Make in India) order text: self-certification, auditor certificate above ₹10 crore, debarment
- Edafter: GeM challenges representation (practitioner guide)
FAQ
Does GeM decide whether my bid is technically qualified?
No. GeM states it has no role in the bid evaluation process. The buyer judges technical and commercial acceptability under the bid document, the GeM GTC and the bid-specific ATC, and objections go to the buyer.
How long do I have to challenge a technical rejection on GeM?
GeM's bid manual gives 48 hours from the publication of the bid result to raise a representation, with a description and supporting documents. The buyer must address representations against disqualification.
Can a trader claim EMD exemption as an MSE on GeM?
No. GeM bid documents state that under the MSE category only manufacturers (for goods) and service providers (for services) are eligible for EMD exemption; traders are excluded. The supporting document must be uploaded with the bid.
What happens if my Make in India self-certification is wrong?
Under the Public Procurement (Preference to Make in India) order, a false declaration breaches the Code of Integrity in the General Financial Rules and the bidder can be debarred for up to two years.
Can I upload a missing document after the bid closes?
Only if the buyer asks for it through a clarification during technical evaluation, within the time the bid allows (often just 2 to 5 days). A representation can explain a rejection, but it does not usually cure a document the bid required and you did not upload.